Honeywell
📢 100% genuine, extensive in-stock inventory, fast shipping!
Honeywell 51202329-735 Input/Output Link Cable
Honeywell 51202329-735 Input/Output Link Cable
Manufacturer: Honeywell
-
Product No.: 51202329-735
Condition:in Stock
Product Type: Input/Output Link Cable
-
Product Origin: USA
Payment:T/T, Western Union
-
Weight: 50g
Shipping port: Shanghai/Yiwu/Shenzhen
Warranty: 12 months
Share
Honeywell 51202329-735 Input/Output Link Cable
The Honeywell 51202329-735, also cataloged as the 51202329 I/O Link Cable, operates as a shielded communication extension for digital I/O signal routing within Honeywell Series C and TDC 3000 Distributed Control Systems.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-735 |
| Brand | Honeywell |
| Origin | USA |
| Weight | Approx. 50 g |
| Dimensions | Length 48 in (1.2 m) |
| Operating Temp | -20 to +65 deg C |
| Storage Temp | Not specified |
| Relative Humidity | Up to 95%, non-condensing |
| Power Consumption | Passive cable |
| Core Performance | Shielded 22 AWG conductor, optimized for high-speed I/O communication |
4-20 mA HART Loop Protocol and Channel Isolation
The cable is engineered for integration with Honeywell Series C and TDC 3000 environments, supporting digital I/O communication loops. Heavy EMI/RFI shielding ensures stable transmission in high-interference industrial settings. Channel-to-channel isolation is maintained through conductor geometry, reducing noise coupling and preserving integrity across extended cabinet layouts.
Frequently Asked Questions
Q: Can the 51202329-735 be used interchangeably with the 51202329-734? A: No, each cable is uniquely labeled and paired for specific I/O link routing; interchange may cause misalignment in system wiring.
Q: How should shielding be terminated during installation? A: Shielding must be grounded at the controller end only to prevent ground loop currents.
Q: Is the cable suitable for redundant I/O paths? A: Redundancy is managed at the controller level; the cable provides standard single-path extension.
Field Installation Guidelines
- Route cables separately from high-voltage conductors to minimize EMI/RFI interference.
- Ground shielding at the controller termination point only.
- Use violet housing identifiers for correct channel assignment.
- Verify continuity and insulation integrity during commissioning with loop test equipment.
- Avoid excessive bending or mechanical stress beyond manufacturer specifications.
Hot Tags :

- Choosing a selection results in a full page refresh.
- Opens in a new window.